Dual Occupancy
686 sqm, R2 Low Density Residential, Epping, City of Parramatta, New South Wales
Getting funding for a project can be tricky at the best of times! Throw in a change in lending standards post-Banking Industry Royal Commission… it caused big hurdles for Stan with this project!
Luckily Stan was able to secure a fixed-price 2020 build contract, sidestepping Covid-19 supply issues and price hikes, which paved the way for a relatively smooth 15-month construction despite navigating multiple Covid-19 lockdowns.
However, there were also several stumbling blocks along Stan’s path with this project:
- Stormwater Engineer couldn’t work with the Architect’s 3-storey design.
- Major bank valuation for construction was much lower than expected.
- Changing lending standards post-Royal Commission posed additional hurdles.
- Unforeseen costs emerged, including soil contamination issues during excavation.
- Navigated construction amidst COVID-19 lockdowns and restrictions, with last-minute curveballs affecting sales results!
Join us as Stan Lee reveals the behind-the-scenes story of this high-end build project, offering invaluable insights and lessons learned along the way to achieving the second-highest price for a Dual Occupancy in Epping!
Don't miss this opportunity to gain firsthand knowledge from a seasoned developer!